What is C check in a diesel generator and what are parts
and what has to be done during the C check
Answer Posted / sanath shetty
C-Check is done in (Every 800-1500 Hrs.)
following are the checks
1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical
6. Check All Electrical terminal & thimbles
7. Check polution level.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
What is the purpose of stand by earth fault protection for transformer ?
How to reduce -234126219.6403 MVAr generation and by what?
What is MSL designation of a motor and same may be provided in details.
How phase displacement change in the over current relay coils.
how to estimate wiring ins roughing ins. and boxes
What are the types of control system?
How to maintain ac plant?
How many size of cable required for a 300m long and 30kw inductive lode
On what basis do you decide the ONAN (Oil Natural air natural) or Dry type transformer for a project?
what is submersible pump?what is different between motor and sub motor?
Types of test in Switchgears, MCC, NGR and DB's how it should be procced. Can anyone give me the details here or email me to pasuvaraj.k@gmail.com
What happened when voltage will half value of current ...
what is gas turbine intercooling ?
A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.
What are test signals and their significance?