Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


name the famous power plants in ap and vwhere it is located
with capacity details



name the famous power plants in ap and vwhere it is located with capacity details..

Answer / sudheer868

NTTPS(Narla Tata Tata Rao) Thermal Power Station
vijayawada -1760MW

Nagarjuna sagar - 965 MW

SRisailam- 1670 MW

Ntpc ramagundam -2600MW

seeleru -460MW

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why transformer rating is given in kva?

2 Answers  


How would you supply power to a village which is very far from a sub-station and has only a 11k?

4 Answers   Power Grid,


When measuring the Insulation resistance of a motor winding (winding to earth) using a megger meter, Applied voltage(1000V) was automatically reduced to 500V. and the measured insulation resistance values are also very low (in Kohm range) Can anyone give me a reason???

3 Answers  


What is earth system using on the floater TN-S or TT. Iam not sure and what ICCP

0 Answers  


what is mean by PID & Principal of working

6 Answers  


WHAT IS DGA TEST FOR THE TRANSFORMERS.

3 Answers   ABB,


why reactive power produce in generator? why inductive load absorbe reactive power?

2 Answers  


What is distance between electrical panel to land ?

0 Answers   Fresher,


Can anyone tell the proper diagram of star delta starter????

0 Answers  


I have 480V Single phase and I am trying to figure how big of a transformer (KVA's) and Primary breaker size I need to provide 200 Amps at 240V for a building.

1 Answers   Wipro,


Why we Specify Transformer rating 433 V Instead of 415V ?

8 Answers   ABB, ERA, Uddans,


why it is necessary to short and ground of a current transformer secondary side?

6 Answers   Ambuja,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)