Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is IS CODE in concrete tiles

Answers were Sorted based on User's Feedback



what is IS CODE in concrete tiles..

Answer / silpa

IS 1237-1990 FOR Tiles(Concrete)

Is This Answer Correct ?    6 Yes 1 No

what is IS CODE in concrete tiles..

Answer / mr.ravichandran

IS 456

Is This Answer Correct ?    10 Yes 6 No

what is IS CODE in concrete tiles..

Answer / shreekantabehera2@gmail.c

IS 1237-2012 for concrete tiles

Is This Answer Correct ?    0 Yes 0 No

what is IS CODE in concrete tiles..

Answer / royal civilian

IS 516

Is This Answer Correct ?    2 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

Is bulkage is considered in crushed sand? if yes..then what is the percentage ??

1 Answers  


1cubic meter of bricks = ? kg

1 Answers  


if the diameter of capillary tube is double then the capillary rise will be

1 Answers  


how many bags of cement,sand and Aggregate to p.c.c. of 1:2:4 ratio.

4 Answers   Isaac Designs,


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

3 Answers  


Define what is quality...

4 Answers  


WHAT IS TEAM SIZE IN CONSTRUCTION WORK

2 Answers  


What do we mean by partial moment release ??

0 Answers  


Wats the formula of eccentric footing and how was calculated from concrete qty

0 Answers  


what is right & short method of measurement of slab&beam

0 Answers  


how to calculate sand in CFT from a concrete foundation (m^3)???

1 Answers  


form work including the props can be removed from beams only after

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)