Answer / pappu meena
Jel earthing should be done in rock/hill areas.
Is This Answer Correct ? | 10 Yes | 3 No |
Answer / munish sharma
In Rocky Area the soil resistivity comes out to be very
high.The overall grounging structure is based on following
criteria
1.Area Of the Switchyard
2.Surface Layer Resistivity
3.Soil Structure
4.Safety PArameters
5.Fault Current Distribution
There Are Certain Techniques in case of HIgh Soil
Resistivity as
1.Deep Groung well Earthing
2.If area is limited of the Switchyard,use Remote grid
along with main grid buried in low resistivity material
3. Soil Treatment
4. Use Grounging rods to take effect of deeoer low
resistivity layers
Is This Answer Correct ? | 6 Yes | 2 No |
Answer / leturtle
Totally depends on your application. Is the ground 'solid'
rock or fragmented mixed in with other material?
What kind of rock? Limestone, granite, mudstone, sandstone?
Depending on the type of rock will determine what solution
will best fit.
Is there any top soil on the surface?
Is This Answer Correct ? | 5 Yes | 6 No |
What is meant rectifiers..
what is the wattage of 'zero watt' bulb?
How supply comes to your home?
What is EHT(Abrebiation,Function,Voltage Regulation & how it works?
Rules and standards of electrical control wiring ?
can u please tell me how VFD(variable frequency) drive is used as a energy saver....?
how do you find making current and breaking current of the circuit breaker
What should be the protection scheme for a 15kw, 3-phase motor working in a lathe machine.
what is the main use of ac and dc drives ? it is only used for speed variation or for power saver also?
What is the function of electron gun used in crt?
what is the difference between switchgear and circuit breakers and is there any difference between outdoor and indoor switchgear and circuit breakers , and how would you differentiate between switch yard and substation and grid station . thanks
what is advantage of using star to delta in place of dol starter