Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


dear sir,
How i calculate the 2 phase welding transformer power or
kva?? kindly tell me....

Answers were Sorted based on User's Feedback



dear sir, How i calculate the 2 phase welding transformer power or kva?? kindly tell me......

Answer / mahenthiran

2phase power=1.414*v*i*cos py

Is This Answer Correct ?    3 Yes 2 No

dear sir, How i calculate the 2 phase welding transformer power or kva?? kindly tell me......

Answer / k.prakashchandra

Treat it as single phase taking the voltage equal root3
times the phase voltage.Almost all welding sets of above 3
KVA, are 2 phase sets .

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

hopkinson's test

5 Answers   Bhel, NTPC,


WHY THREE PHESE SYSTEM VOLTAGE APPLIED IN 440 VOLT

0 Answers   Infotech, InTech,


1. What kVA rating is required for a transformer that must handle a maximum load current of 8 A with a secondary voltage of 2 kV?

3 Answers   BCPL,


How to control the dc motor in ac supply without thyristor circuit?

2 Answers  


If a HV Underground Cable (13.8KV) is layed in the ground below 1.5 Mtrs and any building construction is done on the Cable route. IS this allowable or Not? What should be the clearance. As per ISO construction on HV cable route is safe or Not? Why? Can any body suggest the site for my question?

1 Answers   ZCL,


difference b/w semiconductor and insulator

5 Answers  


What is the meaning of floating point earthing in battery backed systems ?

0 Answers  


In some countries it is found that an Earthing Transformer is connected at the LV sides of the Transmission and Distribution Substation Transformers.Actually what is the purpose the Earthing Transformer?

1 Answers  


Generator,motor and alternator Working principal Please explain easily

0 Answers  


Acually generator neutral is earthed,if suppose cable from neutral is brokened under theearth ,what will happen.

2 Answers   L&T,


What are IR values and what it should be for coil and for insulator

0 Answers   GPSC Gujarat Public Service Commission,


What is mean by staling?

2 Answers   UPPCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)