i dont think it is possible,
because i know 1400rpm is
the rated speed or full load speed,
even we vary the frequency still
it will overload because the
2000rpm is higher than the
full load rpm.
Is This Answer Correct ? | 1 Yes | 0 No |
u can use variable frequency drive. Yaskava, fugi,franic are the
drive's compney, u can increase or decrease the speed by increse
or decrease the frequency. This is the best method for speed
purpose and also for protection purpose
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / simon peter
Use a 3 phase VARIAC transformer bcs v is directly prop to I & if both r increased the speed will increase automatically.....
Is This Answer Correct ? | 0 Yes | 0 No |
A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?
What is function of inverter? and who it's operate & what are controlling devices are used?
In case of any eventuality, who is your next of kin?
2 Answers Edison, Foster Wheeler, GE, GE Energy, HP, Infosys, Koch Industries, Roper Industries, Siemens,
How to design the earth grid for lightning protection in an industry
If rotor works in clock wise what happens
in alternator permanent magnet generator is also connected on the alternator shaft,then y that PMG voltage is very low as compared to alternator?
Compare OH Transmission & UG Transmission?
Does induction motor start with dc power supply????
why we use separate earthing for two seprate machine??
There is two transformers of 2MVA & 3MVA, which transformer is located at the sending end & which is at receiving end. why?
There is any especial requirement for motor to drive through with VFD?
Pls explain about full theory of salient pole generator?