Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In A.C systems, fuse is placed in phase-in order to
disconnect the circuit during faulty condition.
But, what is the reason for putting "LINK" in neutral
istead of connecting through (same) wire.

Answers were Sorted based on User's Feedback



In A.C systems, fuse is placed in phase-in order to disconnect the circuit during faulty condition..

Answer / s k sudhakar

TO ATTEND ANY PROBLEM IN A PARTICULAR SYSTEM, THAT SYSTEM
IS REQUIRED TO BE ISOLATED. IF LINK IS NOT PROVIDED COMLETE
ISOLATION IS NOT POSSIBLE.

Is This Answer Correct ?    7 Yes 2 No

In A.C systems, fuse is placed in phase-in order to disconnect the circuit during faulty condition..

Answer / suseendran

Phase will have voltage(potential) whereas neutral is
potential free.

Imagine
if a phase conductor(wire) gets cut and touches the earth.
Fault current flows thro it and fuses are required to
isolate the circuit.

Whereas if a neutral conductor gets cut and touches the
earth. Nothing will happen since it is potential free. So
fuses are not required.(Links are cheaper than fuses)

Is This Answer Correct ?    1 Yes 2 No

In A.C systems, fuse is placed in phase-in order to disconnect the circuit during faulty condition..

Answer / mritunjay singh yadav

neutral link is provided in neutral to protect the current
transformer from being the open circuit in faulty condition.

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

What are the types of class b amplifier?

0 Answers  


what is the advantage and disadvantage of billing in kwh and kvah by electricity board .

6 Answers   Nespak, NTPC,


how many safety really of DG sets.

0 Answers   MBD, Nerolac,


Convert a star connected network into a delta connected network.

0 Answers   Syntel, Visa,


two or more transformer are working in parallal,one is out of order,what are you doing?

7 Answers   wbsedcl,


In tranformer winding Connection Like Dyn1 ,so LV lags Hv by 30 deg and Dyn11 LV lead HV by 30,so how do this lagging and leading afffect the transformer??

2 Answers   Siemens,


requirements for making parallel operation of Uninterrupted power supply

2 Answers   Emerson,


why we condut tan delta test i want brief explain?

3 Answers  


in Telecom DC system-why positive +ve is made earthed.and - ve is fed to load.

0 Answers  


what is the use of Antipumping in HT breakers.

9 Answers  


Capacitors are used to ... -Reduce the bill of the farmer -Improve the PF

1 Answers  


Can we parallel two grid with different incoming voltage. Ex.let say one grid is 132kv and another is 220kv.

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)