Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In A.C systems, fuse is placed in phase-in order to
disconnect the circuit during faulty condition.
But, what is the reason for putting "LINK" in neutral
istead of connecting through (same) wire.

Answer Posted / s k sudhakar

TO ATTEND ANY PROBLEM IN A PARTICULAR SYSTEM, THAT SYSTEM
IS REQUIRED TO BE ISOLATED. IF LINK IS NOT PROVIDED COMLETE
ISOLATION IS NOT POSSIBLE.

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please brief me about number of pole in alternator.In single phase alternator coils are connected in star or series. How to calculate frequency for the same.

1966


What are the section criteria for cables. Now everywhere XLPE power cable is used or PVC is also used?.

1711


1.why are not using acb 33kv ht side? is there any problem 2.what is difference between acb,vcb,sf6 breackers? 3.what is the function of invertor and convertor in ups?

2221


how to check three phase motor torque value?

2427


Differentiate between induced emf and self inductance?

1213


HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER

2253


I have done my m.tech in electrical engg discipline. Can any one please suggest me how should I prepare for getting into phd in iit or nit.How should I prepare for getting into lecturership

1734


We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.

2055


what is invertor supply and raw powersupply

2165


what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?

2005


where can the transformer having vector group Yny0 be used??

4174


What are the characteristics of negative feedback?

1116


how cables go in and come out for distribution from the feeder pillar box?

2135


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1910


What is the two pole structure?

2009