Answer / naresh
scouring is a process in which soft soil remove from near
the piers, due to the high stream flow.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / moula
removing of softsoil on stream or any water place due to
high velocity of water
| Is This Answer Correct ? | 4 Yes | 0 No |
Scouring can be defined as a process due to which the particles of the soil or rock around the periphery of the abutment or pier of the highway bridge spanning over a water body, gets eroded and removed over a certain depth called scour depth. Scouring usually occurs when the velocity of the flowing water increases or crosses the limiting value that the soil particles can easily handle.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / royal civilians
its the act of water to clean the surface.....this
scouring improve the softness of soil...i.e
river .......i have studied it in applied geology.....
| Is This Answer Correct ? | 2 Yes | 1 No |
removal of sediments such as sand and rocks around bridge abutement or piers
| Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
0 Answers AIZAZ General Contracting General Maintenance, GK Realtors,
why seismic analysis not done during design of slabs
Are you good at detailing and explain about the project you have worked on detailing?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
In the roof of a pumping station explain briefly the components of a waterproofing system?
How to find concrete quantity for a circular column ?
Explain different types of rcc pipes.
quantity of sand in cft in 1:6 cement sand mortar
you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
wat would be the probable interview questions and GD topics for IOCL exam?
what is difference between characteristic compressive strength and compressive strength of concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)