Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the difference between Backfilling & Refilling in
Earth Work Group Item ?

Answers were Sorted based on User's Feedback



What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / gopi

back Filling:
after completing foundation or any structure,doing that gape filling or extra area
Refilling:
temporary or wrong excavation filled all excavated area

Is This Answer Correct ?    4 Yes 5 No

What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / sjtbehera

Backfilling is done after a structure complete its ground construction. Refilling means cutting then immediate filling but you go without technical both are same meaning.

Is This Answer Correct ?    2 Yes 5 No

What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / sha

The excavated sand filling called back filling..and filling
red earth from out side is called refilling

Is This Answer Correct ?    2 Yes 9 No

Post New Answer

More Civil Engineering Interview Questions

tensile strength of shuttering ply wood=?

2 Answers   L&T,


how is calculate the developement length of column such like as L

1 Answers   Euro School, L&T,


cement and sand required for one block of size 0.23*0.15*0.46

0 Answers   EJOM,


What is pre-stressed concrete?

0 Answers  


How many no of bricks form 1 cum? How many no of solid blocks form 1 cum?

3 Answers  


how to calculate triangular ring cutting length

2 Answers   ERA,


8mm steel not available at site used bar 8mm and 150cc please tell me specing i used 10dia bar write formula please

4 Answers   Bestech,


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

0 Answers   Hashmi Constructions,


what is the wet quantity of concrete?

4 Answers  


m15 screeding concrete ration calculation

0 Answers  


How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?

2 Answers   GMC,


why is M30 grade Concrete use for Foothing & Column M50

0 Answers   HPCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)