Answer / gopi
back Filling:
after completing foundation or any structure,doing that gape filling or extra area
Refilling:
temporary or wrong excavation filled all excavated area
| Is This Answer Correct ? | 4 Yes | 5 No |
Answer / sjtbehera
Backfilling is done after a structure complete its ground construction. Refilling means cutting then immediate filling but you go without technical both are same meaning.
| Is This Answer Correct ? | 2 Yes | 5 No |
Answer / sha
The excavated sand filling called back filling..and filling
red earth from out side is called refilling
| Is This Answer Correct ? | 2 Yes | 9 No |
tensile strength of shuttering ply wood=?
how is calculate the developement length of column such like as L
cement and sand required for one block of size 0.23*0.15*0.46
What is pre-stressed concrete?
How many no of bricks form 1 cum? How many no of solid blocks form 1 cum?
how to calculate triangular ring cutting length
8mm steel not available at site used bar 8mm and 150cc please tell me specing i used 10dia bar write formula please
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
0 Answers Hashmi Constructions,
what is the wet quantity of concrete?
m15 screeding concrete ration calculation
How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?
why is M30 grade Concrete use for Foothing & Column M50
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)