What is the difference between Backfilling & Refilling in
Earth Work Group Item ?
Answers were Sorted based on User's Feedback
Answer / gopi
back Filling:
after completing foundation or any structure,doing that gape filling or extra area
Refilling:
temporary or wrong excavation filled all excavated area
Is This Answer Correct ? | 4 Yes | 5 No |
Answer / sjtbehera
Backfilling is done after a structure complete its ground construction. Refilling means cutting then immediate filling but you go without technical both are same meaning.
Is This Answer Correct ? | 2 Yes | 5 No |
Answer / sha
The excavated sand filling called back filling..and filling
red earth from out side is called refilling
Is This Answer Correct ? | 2 Yes | 9 No |
how many area req.in 15000liter water tank
What is the weight of std brick and 6" ,8",4" solid block...?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
What type of foundation preferred in sandy soil ?
Find out the Cutting Length of Closed Hoop 2 Legged Stirrups for Beam as mentioned. Beam Size :200x300 mm,Nominal cover for all sides :25 mm,8 mm dia. Fe415/500/550.
size of the traditional brick is 248*121*71 in mm,but why the size are like this.why the size are not like that 211*154*75 in mm
In block work seawalls what is the purpose of slip joints?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
What is the IS code of Rcc & PCC
How many are the types of joints?
how many liters of water required for 1cu.m concrete?
what is the weight of 12 mm 40 mm aggregate?