What is the difference between Backfilling & Refilling in
Earth Work Group Item ?

Answers were Sorted based on User's Feedback



What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / gopi

back Filling:
after completing foundation or any structure,doing that gape filling or extra area
Refilling:
temporary or wrong excavation filled all excavated area

Is This Answer Correct ?    4 Yes 5 No

What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / sjtbehera

Backfilling is done after a structure complete its ground construction. Refilling means cutting then immediate filling but you go without technical both are same meaning.

Is This Answer Correct ?    2 Yes 5 No

What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / sha

The excavated sand filling called back filling..and filling
red earth from out side is called refilling

Is This Answer Correct ?    2 Yes 9 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3

0 Answers   Ajnara Group, Assosa University,


How many no of bricks in 4.5 inch wall per m3 If brick size is 9"x4"x2 3/4"?? Please

2 Answers   AR Rahman Foundation,


IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT

1 Answers   ZCL,


How to calculate concrete,s cement, sand, metal on the bases of its ratio. For any volume of work please give me brief calculation

5 Answers   L&T,


What is meant by Crystal Concrete?

0 Answers   Jain Housing,






how can we calculate the amount of concrete in trapezoidal footing?

4 Answers  


Concrete cover for slab, column, beam and footing?

0 Answers  


In jack arch floor, the rise is kept?

0 Answers  


As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.

0 Answers   Finance,


What is chemical composion test

0 Answers  


Where are laterally loaded piles are used in practice?

2 Answers   NBCC, Simplex,


calculate qty of sand in 15 mm plaster for 100 sqm.

5 Answers   NHPC, Vellapally,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)