Answer Posted / iamrk1293
Scouring can be defined as a process due to which the particles of the soil or rock around the periphery of the abutment or pier of the highway bridge spanning over a water body, gets eroded and removed over a certain depth called scour depth. Scouring usually occurs when the velocity of the flowing water increases or crosses the limiting value that the soil particles can easily handle.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
I what know about life time of frp tank plz explain about it specifications & other details
115mm thickness brick work how to required mortar
use ofr concrete as per grade ?
Explain moment of inertia?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
how we calculate the grade of the Bituminous materials.?????
in the construction of residential building what type of tank are used?where?why & what is its purpose?
what is the mode of method of face bar measurement
What is made from large rocks, which protects the base of cliffs?
what is the breaking strength of wall tiles
Explain major difference between auto level and dumpy level?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?