Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to convert resistance value at 20 degree to 90 degree?

Answers were Sorted based on User's Feedback



How to convert resistance value at 20 degree to 90 degree?..

Answer / sanjeet swarnakar

Ro -resistance at o degre centigrade
Rt -resistance at t degre centigrade
we have formula
Rt = Ro(1+alpha t)
here alpha is cofficient of resistivity

Is This Answer Correct ?    14 Yes 0 No

How to convert resistance value at 20 degree to 90 degree?..

Answer / anand

Rt = Ro(1+alpha *Delta t)

Is This Answer Correct ?    11 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

i want wipro vlsi placement pattern please send me

0 Answers  


why we are using DC supply in megger?

3 Answers   TATA,


what are the specifications for Dc cables of higher rating

1 Answers   Reliance,


How will polarity test of Dy5 transformer ?

2 Answers   BSL,


If we have 11 kv RYB Phase single core cable near about. Then wht effect and losses

0 Answers   Kirloskar,


For 132 KV line, PT or CVT which is prefered for measuring & protection? is there any IS or IEE standard available?

1 Answers  


In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.

0 Answers  


Which test will be more severe for VCB?

0 Answers   CPRI, Reliance,




0 Answers   TATA,


what is servomechanism?

1 Answers  


A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.

0 Answers  


What is the function of lead sheath?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)