What is MRP types?
Answers were Sorted based on User's Feedback
Answer / murali
MRP type is concept of planning for the demand, whther we
need the material
- to be planned internally
- to be procured externally
- to be planned in externall system (ex APO
- No planning
- time based planning
Is This Answer Correct ? | 12 Yes | 1 No |
Answer / jaffar
MRP is Material Resource Planning which is based on
Transfer of Requirements while processing the Sale Order.
MRP types based on Consumption based MRP etc.,
Jaffar.K
Is This Answer Correct ? | 11 Yes | 7 No |
Answer / joy
The MRP Types is found in the Material Master Record.
The MRP Types is used in the Material master to determine
how a material is planned for automatic reorder point
planning, manual reorder point planning or forecast based
planning
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / v.suresh
Material Requirement Planning is a Computerized Inventory
Control.
it need somme input and you get output of the product.
Input as BOM,Aggeragate Planning,MPS
output as Delivery time of our product and Demand of the
product.
Is This Answer Correct ? | 2 Yes | 3 No |
Answer / rajnish kumar sinha
mrp is the maximum price allocated to a material while give
its price.
Is This Answer Correct ? | 8 Yes | 29 No |
T.code for cust.master creation?
What is ‘consignment stock processes'?
Where do we assign calender in the master records?
Is it possible with 2 quotations one sales order
Tell me the basis / logic behind forming different Sales Organizations? Please provide answer to this question asap.. I am waiting for your reply eagerly. Expecting quick response from your end. Thanks in advance..
what is condition suplement
WHAT IS THE USE OF "MODULE EXT AT EXIT-COMMAND"
What are all the things an interviewer is looking in a SAP-SD consultant with over three years of experience in SAP-SD and over two years of experience in sales for a Implementation project or a Support project?
What is your role in implementation project
Relation ship between sales organization and plants?
46) Sales order is created 1st November for 200 tooth pastes 100 brushes free of goods(2+1 free goods).At the time of delivery on 15th November you have shortage of brushes by 40. offer closed on 15th November . How do you solve in this scenario?
In general what are all the reports has to prepare as a sd consultant in implementation project?