how will define a bug generally?
Answers were Sorted based on User's Feedback
Answer / rudraneel
Bug is a Flaw in a system or system component which may
cause to fail the system or the system component to provide
its desired operation.
Normally bug is found if there is a
mismatch between Expected and Actual result.
When a bug is found it is marked by digits 1 to 4.It is the
priority(HOW FAST THE BUG SHOULD REMOVE) associated with
bug set by the tester or the test lead.Like
1 - Very Major
2 - Major
3 - Average
4 - Low
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / illa srinivas
bug is nothing but devition from requirement.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / tulsi
Bug is mainly defined as a deviation from the requirement
if any field doesnot perform its functionality as per the
requirement functionality then it is called as abug
| Is This Answer Correct ? | 0 Yes | 0 No |
Test cases have written according to Flow of the software working or according to Screens?
What is Test Data?. When we prepare test data?, is it included in Test Cases or should it be seperately prepared. What and when will be the actual use of Test Data and who prepares it.
. Is any graph is used for code coverage analysis?
What are testing techniques? What is difference between general and specific?
What is two tier and three tier architecture?
13 Answers HCL, IBM, iGate,
what are the -ve test cases for Railway Ticketing System?
how to excute testcases in regression testing time.
As a manual tester what will do from day one getting the project and till signoff?
how to retrieve the test data?
How do ensure that we prepared Test cases for all the requiremets.. or how do we ensure that we didn't missed out any requirments...do we prepare any Tracebility matrix.. can anybody answer this question...
what are functional and non functional requirement of SRS document..
What is the difference between software Product and Project