Answer Posted / rudraneel
Bug is a Flaw in a system or system component which may
cause to fail the system or the system component to provide
its desired operation.
Normally bug is found if there is a
mismatch between Expected and Actual result.
When a bug is found it is marked by digits 1 to 4.It is the
priority(HOW FAST THE BUG SHOULD REMOVE) associated with
bug set by the tester or the test lead.Like
1 - Very Major
2 - Major
3 - Average
4 - Low
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
3. In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed at 40%. To the nearest whole pound, which of these groups of numbers fall into three DIFFERENT equivalence classes?
What do you do (with the project tasks) when the schedule fails?
how many modules in ur bank project? what functionalities r there?how did u check? could u plz expalin ur banking project?
What are the types of maintenance?
How soon the bug should get fixed?
How to test the below code and write test case? Prove that this code is wrong? int add(int a ,int b) {return a+b; }
pl. give me the list of top jobs website to register i have 2Yrs. Experience in manual testing
What is six sigma?
What is user acceptance testing (uat)?
What is smoke testing and what is sanity?
tell wat u did in ur banking project?
what is coupling integration testing
Tell me some Adhoc testing scenarios of ebay (online auction product)?
What are noise variables?
wht is Manual Testing Frame work