As a manual tester what will do from day one getting the
project and till signoff?



As a manual tester what will do from day one getting the project and till signoff?..

Answer / raj

Manual Tester activities:
He re the tester activities depends on his Role
i.e
Fresher for testing,
Sr. Test Engineeer(3-4 years of solid test experienec),
Test Lead,
Test Manager..etc
I will explain now Tester role as Test engineer with out
experience/leass experience:
After kick off meeting development team prepares some
documents i.e:
SRS,FRS documents,
UseCase documents
Design document(Low level,High level)
Screen Teamplates ..etc
Then Project manager selects people for implementing
and testing the projects based on their Skill,
Previous experience.
Expalins about the project domain and project scope.
Then Tester starts reading requirement document.
Then he note downs his queries/clarifications on the
requirments.
Prepared Testcases based on requirements.
This testcases will be reviewed by the sr testing people.
in some companies these testcases also reviewed by dev
project manager.
Mean while devlopment team will complete their coding
and releases first build for testing.
Testing team will conduct Smoke test on the build.
If the smoke test passes then testing team will proceed
execution more details testcases on the build.
after completion of first round testing tester will
prepare a test results document,Consolidated Defect list
document,Test Execution Summary document.
This documents will be sent to test lead or Project
manager or keeps in Configuration management tool like
VSS.
Also after finding every defect that must be reported to
development team ASAP.

more detailed

Is This Answer Correct ?    24 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

Please give me example of - 1. High Severity and High priority Bug ? 2. High Severity and low priority Bug ? 3. High priority and low severity Bug ? 4. Low Severity and low priority Bug ? Thanks

3 Answers   HCL,


swap 2 variables without using 3 rd variable???

10 Answers   Philips,


can we do iterative testing in v-model?

3 Answers  


To test a application what is required is functional specfication or busniess requirment ?

3 Answers   IBM,


Expain testing proces of your company?

6 Answers   AppLabs,






How many Test Cases do we need to write for a particular application?(For example, for this AllInterview.com?)

4 Answers   InterGraph,


i have an android phone i want to share a photo to my friends phone via Bluetooth.can you tell me possible test cases for this?

2 Answers  


On what basis you are fixing up the time for project completion?

0 Answers  


what is the of testing in sdlc

3 Answers  


what is software workbence process ?

1 Answers  


Hello people...im planning to jump into Manual Testing field. How should i start. Please guide me.. Thank you

12 Answers  


My questions are- 1. If we have 1 week time in hand what will be the approch of testing. 2. If we have very lesstime in hand then how we will do the regration testing. 2. When there is a change in requirement in module A then what should be the approch to change in that module and in other module like B,C etc an whow we update the test case pls explain the scenario in detail. 3.How do you confirm that for perticular funtionality all the test cases has been written. Thanks

1 Answers   IBM,


Categories