As a manual tester what will do from day one getting the
project and till signoff?
Answer / raj
Manual Tester activities:
He re the tester activities depends on his Role
i.e
Fresher for testing,
Sr. Test Engineeer(3-4 years of solid test experienec),
Test Lead,
Test Manager..etc
I will explain now Tester role as Test engineer with out
experience/leass experience:
After kick off meeting development team prepares some
documents i.e:
SRS,FRS documents,
UseCase documents
Design document(Low level,High level)
Screen Teamplates ..etc
Then Project manager selects people for implementing
and testing the projects based on their Skill,
Previous experience.
Expalins about the project domain and project scope.
Then Tester starts reading requirement document.
Then he note downs his queries/clarifications on the
requirments.
Prepared Testcases based on requirements.
This testcases will be reviewed by the sr testing people.
in some companies these testcases also reviewed by dev
project manager.
Mean while devlopment team will complete their coding
and releases first build for testing.
Testing team will conduct Smoke test on the build.
If the smoke test passes then testing team will proceed
execution more details testcases on the build.
after completion of first round testing tester will
prepare a test results document,Consolidated Defect list
document,Test Execution Summary document.
This documents will be sent to test lead or Project
manager or keeps in Configuration management tool like
VSS.
Also after finding every defect that must be reported to
development team ASAP.
more detailed
Is This Answer Correct ? | 24 Yes | 0 No |
Please give me example of - 1. High Severity and High priority Bug ? 2. High Severity and low priority Bug ? 3. High priority and low severity Bug ? 4. Low Severity and low priority Bug ? Thanks
swap 2 variables without using 3 rd variable???
can we do iterative testing in v-model?
To test a application what is required is functional specfication or busniess requirment ?
Expain testing proces of your company?
How many Test Cases do we need to write for a particular application?(For example, for this AllInterview.com?)
i have an android phone i want to share a photo to my friends phone via Bluetooth.can you tell me possible test cases for this?
On what basis you are fixing up the time for project completion?
what is the of testing in sdlc
what is software workbence process ?
Hello people...im planning to jump into Manual Testing field. How should i start. Please guide me.. Thank you
My questions are- 1. If we have 1 week time in hand what will be the approch of testing. 2. If we have very lesstime in hand then how we will do the regration testing. 2. When there is a change in requirement in module A then what should be the approch to change in that module and in other module like B,C etc an whow we update the test case pls explain the scenario in detail. 3.How do you confirm that for perticular funtionality all the test cases has been written. Thanks