difference between high way pavement and local road?
Answers were Sorted based on User's Feedback
Answer / bharani.r
high way pavements are constructed based on IRC
recommendation.it have a correct pavement width, super
elevation, shift, etc., it is capable to withstand high
vehicle load, give limited friction on vehicle, and have
flexibility to withstand load without any damage. but local
roads are have less importance so it doesn't satisfy all
requirement.
Is This Answer Correct ? | 44 Yes | 2 No |
Answer / vinod kharkwal
highway pavements are made to bear high speed rolling
loads while street roads are made for light loads.
Is This Answer Correct ? | 10 Yes | 3 No |
Answer / vikash agrawal
The main diffrence are for the highway pavement more width
of road provided than local road , thickness of road is
also more than local road, all the cautionary ,mandatory
&informatery signs available in highway road comparing with
local road & fund providing agencies to highway are sate{
P.W.D.}& central govt in case of local road like Z.P.& Gram
Panchayat
Is This Answer Correct ? | 10 Yes | 4 No |
Answer / rasesh
Highway is the way which provides best riding quality.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / k.nanditha
high way pavement connects states where as local road
connects local area.
Is This Answer Correct ? | 5 Yes | 7 No |
Answer / m. chandra sheker
As the name itself tell's HIGHWAY means HIGH - WAY, it means the level of pavement is higher than the ground level, the reason is HIGHWAY must serve through out the year.so, it should be kept away from water,floods etc....
Is This Answer Correct ? | 3 Yes | 6 No |
Answer / bindu.m
for higway pavements the design is done based on the IRC
recommendations and all the geometric requirements are
maintained.it is rigid pavement. all laboratory based tests
were carried out for the design of pavement.
in case of local soil there no requirement of carring
laboratory based tests. it is a flexible pavement.
Is This Answer Correct ? | 5 Yes | 9 No |
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
I got a concrete base to do 2200 x 2200 x 150 mm can you tell me how to calculate the quantity of cement to use
curing of concrete why 7day's,14day's 21day's 28days
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
polavaram project is situated inwhich place?
What is a bearing capacity of soil?
Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR
How will you reduce the concrete flow after mixing the concrete
what means if slump is less than 25mm and greater than 80mm?
why secondry beam rest on primary beam
1 Answers Exotica Housing Infrastructure,
What is meaning of tlc
shearing strength of cohesionless soil depends upon dry density rate of loading confining pressure all above