Which construction joint is much better ?
either vertical or horizontal?
Answers were Sorted based on User's Feedback
Answer / rama
ans : horizontal. because vertical joint can easily damage during earthquake or other lateral force like wind load. so compared to vertical joints, horizontal joint may be better.
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / shaikh sayeed
Construction Joints should be minimum in execution. and the
location is to be decided carefully. Constr. Joint should be
at right angle to the span of member. e.g horizontal in
vertical columns and vertical in horizontal beams. Flexural
Strength of member due to construction joints depends upon
prepration of surface before making a joint, location of
joint. ref: Design and contruction of joints in concrete
structure, M.N Bussel
| Is This Answer Correct ? | 4 Yes | 1 No |
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
0 Answers Ras Engineering, UltraTech,
Why is concrete cube test carried out?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
how to identify np3 pipe and np4 pipe
0 Answers NCC, Petron ltd, RCC Laboratories India Private Limited,
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
what is difference between GTS bench mark and temporary bench mark
What is the mixing ratio of M7.5,m10,M30,m35&m40?
15 Answers Reliance, Umiya Construction,
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
what is the weight of 8mm dia steel with 1 meter length. Is there any formula to calculate the weight for any given diameter
48 Answers Benny Industries, D M Systems, L&T, MYC Infra, OL, PWD, Shell, SMB, SODI, Spyro Engineers, TNS, Welspun,
Which standard describes the tolerance limit for undulation of RCC wall/ after POP surface?
What is the Alternative material of cement, We use for Floor tilling and Wall tailing purpose?
how to prepare analysis of hire charges for 62.5 KVA generator
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)