difference between high way pavement and local road?
Answer Posted / vinod kharkwal
highway pavements are made to bear high speed rolling
loads while street roads are made for light loads.
| Is This Answer Correct ? | 10 Yes | 3 No |
Post New Answer View All Answers
How cracks in concrete can be avoided?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Please tell me vasthu room sizes. Thanks.
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
400 ku d/c clearess ketan hota hai?
What are the uses of alloys in daily life and how are alloys made?
what is right & short method of measurement of slab&beam
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
Define line type?
For a washout valve why are two gate valves required in normal practice?