difference between high way pavement and local road?
Answer Posted / vikash agrawal
The main diffrence are for the highway pavement more width
of road provided than local road , thickness of road is
also more than local road, all the cautionary ,mandatory
&informatery signs available in highway road comparing with
local road & fund providing agencies to highway are sate{
P.W.D.}& central govt in case of local road like Z.P.& Gram
Panchayat
| Is This Answer Correct ? | 10 Yes | 4 No |
Post New Answer View All Answers
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
Why are steel plates inserted inside bearings in elastomeric bearing?
what is the use of water bar in water tank and is this an extra item in estimate?
what is conrete grade ,how are depent on concrete grad and size of concrete?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
what is a well
Why steel rods are produced only in even dimensions?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
what are the values of compressieve strenght?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
dialation means