Give 3 scenario due to which you require Gap analysis in
your project?
Answer / gvkreddy
"We require the following"
steps:
we need project preparation
we need to prepare the blueprint
we need reliazation.
in this phase
we are the thing need to be calculate the requirements and
what r going to be need to satisfy the customer.This
analysis is called Gap analysis in our project.
Is This Answer Correct ? | 0 Yes | 4 No |
Can u perform on Commit?
Mention the various databases integrities?
1.If there is one receiver,then To send 10 materials at a time through BD10 tcode, How many Master Idoc create? 2.If there is one receiver,then To send 1 material at a time through BD10 tcode, how many Master Idoc generated? 3.Can I Send Multiple Messges through BD10 tcode?
Can i create a Table without a Data Element ? How ?
I have modified standard sapscript layout set MEDRUCK.But could u tell me the procedure to trigger the layout set for printing. Thanks Rahul
If i created a new field in a table i want to see the field is created by whom? Tell me the specific table name which is contained all the user details.
What is the difference between select statement and provide statement ? : abap hr
What are the components in sap application server?
what is the remote system in ale whether it is sender / receiver?
WHAT IS MEAN BY XK01, VA01 AND VD01 IN BDC PROGRAMES
30) What is a text table?
i can give default values in select-options also then what is use of INTIALIZATION event?