Do you expect there to be many jobs for civil engineers
going into the future?
What are the three main drawbacks of being a civil engineer?
What are the three best things about being a Civil engineer?
What amount of vacation time is available to you?
Is the time paid?
What are the usual hours of work required?
Is it possible, or common, to work from home?
How much time do you spend on the site of your projects?
What type of schooling is required to be a civil engineer?
How many years are required to complete this education?
Answers were Sorted based on User's Feedback
Yes
THREE MAIN DRAWBACKS- WORK AWAY FROM HOME, COMPENSATION
COMPARITIVELY LESSER THAN THAT OF REMAINING ENGINEERS &
RECENT TRANSFERS/CHANGES OF SITES AS PROJECT COMPLETES AND
TO FACE DIFFERENT WEATHERS WHICH ARE AFFECTING HEALTH IN THE
LONG RUN.
THRE BEST THINGS - ADAPTABILITY OF THE SITUATION,GOOD
COMMUNICATOR WITH LOCALS WHERE EVER HE WORKS & CAN COMMAND
THE WHOLE MANPOWER WHAT EVER THE FIELD THEY BELONG TO.
NOT SUFFICIENT ;SOME TIMES IT ,AY BE PAID
7AM -4 PM
AT TIMES IT IS POSSIBLE
WHEN STAYED AT SITES ALL MOST 12 HRS PER DAY ACCORDING TO
WORK &REQUIREMENT.
SCHOOLING IN RURAL AREAS IS BEST TO GROW AS A CIVIL ENGINEER
21YRS
Is This Answer Correct ? | 14 Yes | 0 No |
Answer / concerned citizen
@ How many years are required to complete this education?
atmost 5yrs here in the philippines
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / shradhs
u cannot work from home..
just 4 years in India..
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / jyoti
1. yes Definately bcoz. life never ends the generation continues and so the desires of man to build structures of his own.........2. Less pay even if workd for day n night...more work.....less time........3.Good Experience practically.....working in natural and healthy environment.....4.No Vacation but the work itself is enjoying....5.9Hrs a day........6.Not every time, bbut some times it is possible.......6.office work....7. Anywhere further knowledge depends upon own interests.....8. Maximum 4 Hours
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ajay
1)yes,
because , construction work every yr increase thus we hope in future many jobs create
2)a)fight with nature like rain wind etc
b)physical fitness required becoz we r work in field
c)
3)a)very most imp "jo pepar pr tayar hota h use hm field me banate h"
b)challenging work. (always learn somthing new)
c)work with natural substances
4)work is enjoyable thus enjoy with work (as a engineer we 3 moths very less work due to rainy seasons in this time structure work done very less , in this time like a vacation time)
5)as per requirement , generally 9am to 7 pm
6)no,because it is mental & also physical work
7)when the my worker and my foreman are satisfied our ans about the project work
8)theoretical is better than(lab, work physically etc) practical because every thing is visualize.
9) 4yrs
Is This Answer Correct ? | 0 Yes | 0 No |
What are the responsibilities of a construction manager?
How to Concrete cube test method and required result in 3days & 7days & 28 days, for all grade of concrete which refer the is code no.
How to calculate brick work quantity?? Block work quantity??
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
what is the difference between np2, np3 & np4 rcc pipes
how to calculate cutting length of stirrups bar in beam
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
WHAT DO YOU MEAN BY MIX DESIGN OF CONCRETE?NAME THE VARIOUS METHODS OF CONCRETE MIX DESIGN.EXPLAIN I.S.METHOD OF MIX DESIGN
If the design mix of M-30 grade concrete is 1:1.5:2.8 (By Weight)& W/C ratio is 0.45, then what should be the volumetric mix for the same ?
how to convert sand from Cum to Brass
What is BOQ why to calculate BOQ