Do you expect there to be many jobs for civil engineers
going into the future?
What are the three main drawbacks of being a civil engineer?
What are the three best things about being a Civil engineer?
What amount of vacation time is available to you?
Is the time paid?
What are the usual hours of work required?
Is it possible, or common, to work from home?
How much time do you spend on the site of your projects?
What type of schooling is required to be a civil engineer?
How many years are required to complete this education?
Answer Posted / jyoti
1. yes Definately bcoz. life never ends the generation continues and so the desires of man to build structures of his own.........2. Less pay even if workd for day n night...more work.....less time........3.Good Experience practically.....working in natural and healthy environment.....4.No Vacation but the work itself is enjoying....5.9Hrs a day........6.Not every time, bbut some times it is possible.......6.office work....7. Anywhere further knowledge depends upon own interests.....8. Maximum 4 Hours
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
how to calculate the density for high density concrete ? or is it same as the density of RC?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
all technical question
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
I what know about life time of frp tank plz explain about it specifications & other details
What things you need to take care of before building a kitchen island?
What is the use of array command?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
Why Is Propping Required For Long Structures Once The Form Work Is Removed?