Answer / pandiyan.m
singly reinforced beam is reinforced at tension zone alone
and doubly reinforced beam is reinforced at both zones and
difference is singiy cannot take too much loads
Is This Answer Correct ? | 37 Yes | 4 No |
Answer / himel
when rf is reqd in only tensile zone of beam, its called
singly rc beam, when moment is large enough is to reqd to
provide rf at compression zone also,called douly rc beam.
load variation is the only difference betn these two.
Is This Answer Correct ? | 14 Yes | 2 No |
Answer / kamal pandey
single rc beam is reinforced at tension zone only and doubly
rc beam is reinforced at comperesion & tension
zone.difference is singly cannot take too much loads
Is This Answer Correct ? | 7 Yes | 1 No |
In singly reinforced beam limiting moment of resistance is higher than design moment. And the reinforcement designed for tension zone only.
In doubly reinforced beam limiting moment of resistance is lower than design moment. And the reinforcement designed for both tension zone and compression zone.
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / desai ankit
In singly rc beam,reinforcement is provided on tension side only.While in doubly rc beam ,reinforcement is provided on compression
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / anil kumar
singly rc beam is defined as in which single bent up bar is
used & doubly rc beams may be defined as in which two or
three bent up bar are used are termed doubly reinforced beam
Is This Answer Correct ? | 1 Yes | 10 No |
what is meant by structural design?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
what is the list of building construction equipment & teir output?
how to identify the failure of building by expansive soils
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
form work including the props can be removed from beams only after
Why the height of the bridges over the river are very low?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
In colomn reinforcement when dia of bar is going to change, than what should be the lap length of bars weather it should be of heigher dia bar lap length or it should the accordance with new dia bar. the grade of concrete is same.
Instrument used for determining PH of water
What is logic behind the use of Steel bar insted of gold bar?
what is the significance of soundness test in Cement? and how is it done??