Thirty men take 20 days to complete a job working 9 hours a
day. How many hour a day should 40 men work to complete the job?
(a) 8 hrs
(b) 7 1/2 hrs
(c) 7 hrs
(d) 9 hrs
Answers were Sorted based on User's Feedback
Answer / mv jaysheelan
(30Men x 20days x 9hrs)/(40Men) = 135 hrs per day. Which
is impossible. So, the answer is none.
Since the question is vague, if you don't answer this
question you may be given mark for this question.
The question should have been
1. How many days 40 men working 9 hrs a day will take to
complete the work.
Answer: (30Men x 20days x 9hrs)/(40Men x 9 hrs) = 15days
2. How many hours a day should 40 men work for 20days will
take to complete the work.
Answer: (30hrs x 20day x 9hrs)/(40Men x 20days)=6 3/4 hrs
| Is This Answer Correct ? | 122 Yes | 34 No |
Answer / dhanaraj
days is eqaul....
so calculte power and time..
power 30 hour 9
power 40 hour x
40x=30*9
x=270/40
x=6.75
x=6 3/4
| Is This Answer Correct ? | 56 Yes | 11 No |
Answer / vishal pitaliya
30*20*9=40*20*x
x= (30*20*9)/(40*20)
x= 27/4
x=6 3/4 hrs answer
| Is This Answer Correct ? | 32 Yes | 10 No |
Answer / vidya
In both cases days are same
so
m1*ti=m2*t2
30*9=40*t2
t2=270/40=71/2
| Is This Answer Correct ? | 213 Yes | 192 No |
Answer / suratnarayan tripathi
30*20*9=40*20*x
600*9=800*x
5400=800*x
x=5400/800
x=54/8
x=27/4 Hours
x=6.75 hours
It means
x=7 hour and 15 minutes
| Is This Answer Correct ? | 30 Yes | 19 No |
Answer / sumit sourabh
‎40 men work 6 hours 45 minutes a day for 20 days to complete the job...........
AS WE SEE
(30*20*9)=(40*20*H)
5400=800 * H
H = 6.75 HOURS
I.E; 6 HOURS 45 MINUTES IS THE WORK DONE PER DAY
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / baddy
equation given: 30 x 9 = 40 x X
=> X = 30 x 9 /40
=270/40
= 6.75
= 6 hrs and 45 mins
So,Ans is
6.75 hrs
| Is This Answer Correct ? | 5 Yes | 0 No |
If a bank clerk can process 80 drafts in half an hour, how many drafts can she process in seven and half hour day?
FIND the next number in the series 11,112,1124,11248,--
The sum of the digits of a two digit number is 8.When 18 is added to the number, the digits are reversed. Find the number?
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, Value of f(f(2))
There were 253 games played so that atleast two team from the group play each other. Find out the maximum no of team? a)441 b)400 c)361 d)484
2 Oranges,3 bananas and 4 apples cost rs.15 . 3 Oranges 2 bananas 1 apple costs rs 10. What is the cost of 3 oranges, 3 bananas and 3 apples
The sum of series 1+1(1+1/n)+3(1+1/n)2+…. Is equal to
A man walks from 9.15 to 5.15 from monday to friday and 9.00 to 12.00 on saturday.Each day 0.45 min lunch. How much time he walks in a week
what is the max no of points of intersection of two circles of unequal radii
7 Answers AAI Airports Authority Of India, TANCET, Verifone,
What is generaly Question asking in Export & Import Job? (Documation Asst. & Office Asst.)
PA and PB are tangents to the circle at A and B respectively and the chord BC is parallel to tangent PA. If AC = 6 cm, and length of the tangent AP is 9 cm, then what is the length of the chord BC?
Hi dis is sravanthi & me from ECE n i hav learned software testing & m preparing for GE plz send me interview pattern & interview questions.plz help me........