Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Thirty men take 20 days to complete a job working 9 hours a
day. How many hour a day should 40 men work to complete the job?

(a) 8 hrs
(b) 7 1/2 hrs
(c) 7 hrs
(d) 9 hrs

Answers were Sorted based on User's Feedback



Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / mahalakshmidevi prathivada

30 * 20 * 9 = 5400 man-hours required to complete the job
:
Let x = no. hrs a day to do the same job (assuming in 20 days)
40 * 20 * x = 5400
800 x = 5400
x = 5400% 800
x = 6.75 hrs a day for 20 days to do the same job

Is This Answer Correct ?    2 Yes 0 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / syed bilal

7 1/2 hrs

Is This Answer Correct ?    29 Yes 28 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / balakumar

7 1/2

Is This Answer Correct ?    24 Yes 23 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / anil

30*9*x=40*20*20
x=7 1/2

Is This Answer Correct ?    16 Yes 15 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / amos galadima

7 1/2 hours

Is This Answer Correct ?    6 Yes 6 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / siddharth

(b) 7 1/2

Is This Answer Correct ?    0 Yes 0 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / mastermind00181

No need to worry about it. the work has already been done those 20 persons. So why do u need to do same job ? read the question carefully.

Is This Answer Correct ?    0 Yes 0 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / baluxyz

9 hrs

Is This Answer Correct ?    0 Yes 0 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / pradipta

30 men takes 20 days & 9 hour to complete 1 job
(Here days constant, only hour is asked)

So 30 men, Each day 9 hour, 20 days =9*20=180 hrs
Den 1 men takes 180*30=5400 hrs

Therefore 40 men will take 5400/40=135hours in 20 days
=135/20=6.75 hours each day

Answer is c (approximately 7 hour)

Is This Answer Correct ?    0 Yes 0 No

Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men ..

Answer / sanjeev kumar

since 30 men take 20 days to complete this job working 9
hours per day

so (30*9)/40
=27/4
= 6 3/4 hours
so option is not correct...

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More General Aptitude Interview Questions

a survey of 250 ppl found that 223 have tatoos,178 wore leather,158 own harry davidson,151 wore tatoo and leather,119 wore leather and own harley,142 have tatoo and a harley, 103 have all the 3 items.draw a venn diagram n explain how many a)had only harley davidson? b)had atleast 2 of the 3 items? c) had none of the items? d)had tatoos or were wearing leather? e)were not wearing leather but did have tatoos and did own a harley? f)did not own a harley but did have tattoos or were wearing leather?

1 Answers  


there is a safe with a 5 digit No. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number. Ans) 65292.

0 Answers   Infosys,


Four of the following five are alike in a certain way and so form a group. Which is the one that does not belong to that group? (a) 17 (b) 23 (c) 37 (d) 13 (e) 73

7 Answers  


A & B can do a piece of work in 21 & 24 days respectively. The started to work together but after some days BA leaves, B completes the remaining work in 9 days. After how many days does A leaves

0 Answers   Axis Bank,


A building with hight D ft shadow upto G A neighbour building with what height shadow C ft is?

0 Answers   Accenture,


Sky Heaven is a 16 stored building with 12000 sq. feet on each floor. Zintac International rents 7 floors and Zobia International rents 4 floors. What is the number of sq. feet of unrented floor space?

0 Answers   Cap Gemini,


Sir, I'm sonjoy bhadra, plz send me previous 10 years solved question papers for sbi clarical exam and also send one model paper pattern for this year

0 Answers  


i will come thrice in a minute, twice in a hour, once in a day, who am i?

2 Answers   Infosys,


What is the code formed by reversing the First and second letters, the third and fourth letters and son on of the string SIMULTANEOUSLY?

0 Answers   Accenture,


4,44,444,4444. Something like this.

4 Answers   3D PLM,


If the graphs of the equations x + y = 0 and 5y + 7x = 24 intersect at (m, n), then the value of m +n is?

0 Answers  


f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, If f(f(X))=81 then the value of X=?

0 Answers   CTS,


Categories