Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.
| Is This Answer Correct ? | 19 Yes | 5 No |
Answer / sumeet
as i think that i am capable of doing this kind of work as i
did many work visit and liked to do work in the field. also
im good at management so i wold love to handle the situation.
| Is This Answer Correct ? | 9 Yes | 7 No |
Answer / shahzad
actually so far as i think that i'm capable of doing such kind of work b,coz previously i'hv workd some where and entirely awared with the terminology of site work.thats why i like to work on site and feel suitable for this position
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nitesh
i think m suitable to work as a site engineer because i m too curious to manage the things around me and the tasks allotted in the most efficient manner.i think that i can suitablt adjust myself in the workng environment of the organisation and too in an effefective manner for the growth company..
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / satish nirmal
site engineer is a monitor of all team member who will work under him and think i can handle very efficiently, as have a passion also to execute the construction work very properly. i like to play a vital role for doing coordination with consultant and architect.
| Is This Answer Correct ? | 0 Yes | 0 No |
How calculate Load Bearing Capacity of Soil?
hai,i completed my b.tech civil.Recently i wrote the appsc exam for managers water supply engg.I want answers for general studies and civil engg paper2.If any body know or written that exam send to my mail id is ruksana.sk08@gmail.com.
best hand book for civil engineers with practical criteria
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
what is IS
12 Answers GMR, JMC, JMC Projects,
cinder filling or Brick Aggregate filling in sunken portion.which one is better
1 Answers Chenab Valley Power Projects,
in coarse stone masonry(bela masonry),how many cement bags are used in cement mortar for proportion 1:6
How can I calculate the Compressive strength of cubes after 28 days of curing?Is there any formula or ration ?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38
How many jacks and props required for one floor, or tell me any thumbrule...to know the approx jacks and props required.?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)