why you considers yourself suitable for the post of site
engineer
Answer Posted / mamatha
Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.
| Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
Will water damage concrete?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Define Workability ?
Define What is the tallest man made structure in the world?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
types of survey and levelling instrument ?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
i need gate exam civil engineering question papers with answers
What is a kip?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
Basic civil interview questions
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
How much cement,sand,bricks and water needed for 1square metre brick work?
how much percent are used 20mm,10mm?
What are the advantages of cad?