Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why you considers yourself suitable for the post of site
engineer

Answer Posted / mamatha

Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.

Is This Answer Correct ?    19 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

rate analysis for cement pointing 1:4 , for 100 sq m

4165


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

1171


Define What does civil status mean?

1408


How to find CN by using arcgis 9.3?

2410


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

2030


Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?

3500


HOw much % of premium on DSR-2013 currently

1953


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2351


what is your role of in previous company as a construction manager

2220


how to design and calculate materail quantity for concrete speedbreaker ?

5982


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

2206


What is the difference between undo & redo?

1256


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1807


I need old MMUP exam question and answer for Civil engineering

1612


How much cement,sand,bricks and water needed for 1square metre brick work?

1814