why you considers yourself suitable for the post of site
engineer
Answer Posted / sumeet
as i think that i am capable of doing this kind of work as i
did many work visit and liked to do work in the field. also
im good at management so i wold love to handle the situation.
| Is This Answer Correct ? | 9 Yes | 7 No |
Post New Answer View All Answers
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
What is componsation
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
what is Short bored pile foundation.
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
What will be weight of 0.5mm GI sheet per sq.ft?
trapozidal
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
how can calculate cutting length of diamond ring
Permissible wastage of cement as per IS code ? In which IS code I get it?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
How much material will consume for following specification water tank (9*7.5*6 feet)?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work