why you considers yourself suitable for the post of site
engineer
Answer Posted / sumeet
as i think that i am capable of doing this kind of work as i
did many work visit and liked to do work in the field. also
im good at management so i wold love to handle the situation.
| Is This Answer Correct ? | 9 Yes | 7 No |
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
why & what is perchatage we are using fly ash in concrete?
Which brick is best for construction ,either fly ash or AAC BLOCKS
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
to minimize budget cost of building , what can i do
what is civil engineer greatest strength and weakness?
What is the outturn of Ceiling plastering
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
What are your goals?
What is the different type of slump test indications?
why development length = 50D . why not 100D
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how to calculate quantity of bricks in circular manhole with examples.