why you considers yourself suitable for the post of site
engineer
Answer Posted / shahzad
actually so far as i think that i'm capable of doing such kind of work b,coz previously i'hv workd some where and entirely awared with the terminology of site work.thats why i like to work on site and feel suitable for this position
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define What is diversion tunnel in a dam?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
what is hydrostatic paradox?
what is modular brick and it size
115mm thickness brick work how to required mortar
why we are useing plastic under the lean concrete?and whts the advantage?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what is flexible and rigid footing?
How to calculate 1 brss for RCC work
How to calculate woden area in sft and Cft
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
which type of instrument included in plumbing work?name of instrument?