Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why you considers yourself suitable for the post of site
engineer

Answer Posted / satish nirmal

site engineer is a monitor of all team member who will work under him and think i can handle very efficiently, as have a passion also to execute the construction work very properly. i like to play a vital role for doing coordination with consultant and architect.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?

2156


What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.

4659


What is the difference between chamfer and fillet?

1404


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2229


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

2003


What are the composition of a landfill?

1193


What year was the keystone power plant in Indiana County constructed?

1114


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1761


How to plan a project

2249


give me the rate analysis for Bituminous Macadam and SDBC

7380


which method is used in semi-rigid connection design??

2230


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

2413


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

2030


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2922


what is called Bulk Density of aggregate?

1839