bridge design
Answers were Sorted based on User's Feedback
Answer / rasmi k.r
bridge design..first we have to make the general layout of
a span of a bridge.then cross beams and longitudinal beams
are placed at suitable spacing and their size is also
assumed.
steps
1.calculate clear span and dead loads like due to slab and
wearing coat
2.calculate bending moments.
3.using pigeadus curve calculate moments
4.load dispersion due to wheel of train is calculated.
class A or class AA is used.now a daya class A IS commonly
used.
5.live load moments calculated.
6.check for shear is also done
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / nsk
First we study about the location, catchment area and
preliminay survey after that if necessay to provide the
bridge. we go to soil investigation and study the report,
afterthat design.
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / raja rammohan nayak
1-First we tapographical survey of this
area where the structure will be
construct.
2-Next prepare a drawing of the bridge
& also calculated design , estimate
the total cost of bridge.Calculated
the loads I.e.dead load , wind load ,
impact load , etc..
3-Then we can construct a bridge..
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / mouli
1. WE STUDY TOPOGRAFICAL SURVEY AND GEOLOGICAL SURVEY TO
FOUND HOW MUCH SCORING CALUCULAT ,YEALED BORE TEST FOR
FOUNDTIONS WHICH TYPE SUTABLE AND AS FOR CLASS LOADS
DIPENDING UP ON NO OF LANES AND CLASS OF ROADS AND WE GO TO
DESIGEN CALUCULATIONS OF MOMEN BY USE pigeadus curve
calculate moments
| Is This Answer Correct ? | 0 Yes | 3 No |
how to design and calculate materail quantity for concrete speedbreaker ?
What is a MIS report?
what are the Task work of different labour.?
what is tie beam? & its function . uses of tie beam.
How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
The slenderness ratio of a column is zero when its length ??
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
What applicable rate of wct in bihar
how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg
How is make concrete cube?
How do we say The LAP LENGHT is 50D to 60D ?????
at which depth the construction of tunnel is economical from cost and engineering aspect.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)