Answer Posted / rasmi k.r
bridge design..first we have to make the general layout of
a span of a bridge.then cross beams and longitudinal beams
are placed at suitable spacing and their size is also
assumed.
steps
1.calculate clear span and dead loads like due to slab and
wearing coat
2.calculate bending moments.
3.using pigeadus curve calculate moments
4.load dispersion due to wheel of train is calculated.
class A or class AA is used.now a daya class A IS commonly
used.
5.live load moments calculated.
6.check for shear is also done
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
how much to get of BRC lapping in full yield and half yield ?
what is the use in canals of longitudinal drains and cross drains in lining areas?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
What is difference between code and standard and specification?
Why are separation membranes used between concrete pavement slab and sub-base?
How we calculate the service time of buildings
Why do you want to work here
how clculate excavated or backfilling quantity by simpson's rule
what is the use of beam end forces while using a staad ? wha they are show
Questions related to civil.engg in company
What is the standard volume of pharma in cub ft
why does the most of civil engg is not intersted to going for teaching field?