Answer Posted / rasmi k.r
bridge design..first we have to make the general layout of
a span of a bridge.then cross beams and longitudinal beams
are placed at suitable spacing and their size is also
assumed.
steps
1.calculate clear span and dead loads like due to slab and
wearing coat
2.calculate bending moments.
3.using pigeadus curve calculate moments
4.load dispersion due to wheel of train is calculated.
class A or class AA is used.now a daya class A IS commonly
used.
5.live load moments calculated.
6.check for shear is also done
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What does civil engineering mean?
Mention what are the composition of a landfill?
How is improve my knowledge in construction industries....
What out turn civil works
five benefits of using standard terminology in the measurement process
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
Why is concrete cube test carried out?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
Define absolute co-ordinates?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs