I measured pcc work as 15.34 m cube , the ratio is
1:5:10 ,want to know the cement, sand and metal used for
pcc measured as 15.34 m cube at this ratio.
No Answer is Posted For this Question
Be the First to Post Answer
what are the differences between Tie beam, Ground beam and strap beam. thanks
Is there a way to know the aprox shuttering qty if vol of concrete is known? any thumb rule?
which percentage is maximum in good quality cement?
1:6 ratio block work purpose how much cement used
1 Answers Spago, VRC Constructions,
2nd and 4rt angle elevation used in which country ?
what is grade slabs
At which place Construction joint should provide in slab and Beam at the time of casting.
as per is code, what is the minimum content of opc and ppc cement for rcc structure
How to calculate material requirement for 230mm thick, 1 sq.m brick masonry?
what is the minimum SBC of soil is required for different types of soil?
What is thumb rule for deep trench excavation
Are you ready to relocate with your immediate family to United States as a new employee?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)