Answer Posted / nsk
First we study about the location, catchment area and
preliminay survey after that if necessay to provide the
bridge. we go to soil investigation and study the report,
afterthat design.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
For what building Built-on balconies are preferable? What are the advantages?
How do you calculate load bearing capacity of a waffle slab?
What is a projection line?
is basic cost of the material includes tax?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What is the usage of zoom command?
What are the methods of measurement? Describe it shortly
How foundation is designed, Column design and beam design
What is the worlds largest concrete dam?
Formula of mid span bar
What are the responsibilities of a construction manager?
What is the difference between 53 grade and 43 grade cement
Sir how to find cutting length for footing steel bars in the shape of "u"
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
how we check the thickness and line of ceiling plaster.