Answer Posted / raja rammohan nayak
1-First we tapographical survey of this
area where the structure will be
construct.
2-Next prepare a drawing of the bridge
& also calculated design , estimate
the total cost of bridge.Calculated
the loads I.e.dead load , wind load ,
impact load , etc..
3-Then we can construct a bridge..
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How can we demolish concrete beams?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
Explain the advantages and disadvantages of using plastic and timber fenders?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
five requirements of infill panels for walls?
What is the biggest dam in america?
Which is the most prominent tower of world?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
pls mail some more tecnical qustions at msaranya2610@gmail.com
For what purpose bedding is used under storm water drains, explain?
Describe a time when you anticipated potential problems and developed Preventive measures
How many kilo-newtons equals 1000 kilogram?
What are the strongest shapes in building?