Answer Posted / raja rammohan nayak
1-First we tapographical survey of this
area where the structure will be
construct.
2-Next prepare a drawing of the bridge
& also calculated design , estimate
the total cost of bridge.Calculated
the loads I.e.dead load , wind load ,
impact load , etc..
3-Then we can construct a bridge..
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How much is the cover for slab?
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Explain creep?
what is the productivity in aluminium shuttering per day
how to remove the quantity of metal 1 and metal 2 in concrete
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What is meant by engineering drawing?
what is the mix design for M:60 with micro silica andmetakaoline?
How can we convert weight batch to volume batch for m30 mix
What is the difference between Fe 500, Fe 500 D and Fe 515.
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
what is E
How to fix toll charge for a particular vehicle at toll booths in a highway?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?