Answer Posted / raja rammohan nayak
1-First we tapographical survey of this
area where the structure will be
construct.
2-Next prepare a drawing of the bridge
& also calculated design , estimate
the total cost of bridge.Calculated
the loads I.e.dead load , wind load ,
impact load , etc..
3-Then we can construct a bridge..
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
in 100 cft = 1350 bricks in 100 cft = ? bloks
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
How to determine thee cut length for steel reinforcement bars in R.C.C design
how to do sudoko puzaals?
What are the different types of foundation?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
why is M30 grade Concrete use for Foothing & Column M50
pls tell me , what is the water content
significance of specific surface area of particles?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What is the per cu. mt. price of ready mix in Gujarat region.?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
I what know about life time of frp tank plz explain about it specifications & other details
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
What is Refuse Area In High Rise Building ?