Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to Concrete cube test method and required result in
3days & 7days & 28 days, for all grade of concrete which
refer the is code no.

Answers were Sorted based on User's Feedback



How to Concrete cube test method and required result in 3days & 7days & 28 days, for all gr..

Answer / a.k.pathania

Concrete cube testing is done using compression testing
machine. Cubes of dimensions 150x150x150mm are casted and
cured properly and tested for 3,7 & 28 days strength. You
can refere codes- IS 516 for cube testing and IS 456 for
concrete-general. Also refer SP-23/24. Concrete mix design
can be done with IS10262.

Is This Answer Correct ?    13 Yes 3 No

How to Concrete cube test method and required result in 3days & 7days & 28 days, for all gr..

Answer / arivazhagan

3 day 1/3 rd strength
7 day 2/3 rd strength
28 day full strength

Is This Answer Correct ?    3 Yes 1 No

How to Concrete cube test method and required result in 3days & 7days & 28 days, for all gr..

Answer / kalidas

Cube test will be done by compressive test machine &
the results contact me i will send

Is This Answer Correct ?    6 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

0 Answers  


what is bulkage

4 Answers  


Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx

1 Answers  


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

0 Answers  


how can i calculate pcc and rcc cu.mtr rate? specify labor and material cost should be diff

2 Answers  


What should be the size (Cubic meter) of a water tank for 1000 Ltrs. capacity?

8 Answers   Modi Builders,


what are RIB slabs explain about it

0 Answers   L&T, NCC,


Why did you choose this career?

3 Answers  


What are the advantages of cad software’s?

0 Answers  


While painting,if the gypsum is the first coat to seal holes on wall,It said to have tendency get away with all other coat. What is the solution on that?

2 Answers  


how much kg of binding wire is used in slab ?

4 Answers   L&T, Standard,


why bent up bars in slab provided in alternate manner and not continuos ?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)