What is meant by slab?
No Answer is Posted For this Question
Be the First to Post Answer
What do you do to run MRP for just one MRP Controller?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
what is the capacity planner ?
Which BOM maintenance functions do you require (copy functions, mass changes, and so on)?
What is the standard info set?
Difference between MD01, MD02 and MD03.
One component 2 times assign to bom
What is the difference between time ticket and time event confirmation and when they are used ?
What are the main controls in MRP?
What happens to plan after it has been converted into production order?
Explain the process of Material costing.
can any one tell me what is the difference between MRP and MPS?