Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
No Answer is Posted For this Question
Be the First to Post Answer
Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
what are the constraints of Variant configuration?
what are the problems you faced in MRP?
Tell some sop
Describe the change process for material BOMs
What is REM or What is REM profile
What is the standard info set?
What is the difference between pp and pp-pi? Which one is better and how ?
Explain schedule margin key
Explain Flexible Planning procedure or How many levels of Flexible planning.
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
How can you get planned orders scheduled so that you can do capacity leveling ?