Required concret Surface Temperature prior to coating of
epoxy pain with references ASTM or ACI whatever
No Answer is Posted For this Question
Be the First to Post Answer
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Is there any codal provision for the use of Micro Silica in concrete?
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
How to calculate laplength for 3 floors
Mix proportions of m30,m35,m40
what is the name of coarse sand which is used in making of concrete
What is Purpose Of Stirrups give In Beam ?
how many BSCs can i connect to the HUAWEI MSC