Define Workability ?
No Answer is Posted For this Question
Be the First to Post Answer
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
in steel bar weight formula (d^2/162).so what is 162.
how much to get of BRC lapping in full yield and half yield ?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
how did find the quantity of cement ,sand , and aggregate in concreat which is givan by volume
Whats the size cube
2 Answers Shimla Hills Construction,
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
How to estimate quantity of paint in 1M3
Outline ten different ways in which typical bill of quantities can be used?
how can i calculate cement in brickwork
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)