how can i calculate cement in brickwork
No Answer is Posted For this Question
Be the First to Post Answer
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
In which code the the maximum height of concrete casting has been explained
Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?
I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this.?
If i buy some material and the seller asks me my TIN number what does that mean?? Is it my Taxpayers Identification number or it is my Tax invoice number? What does both of these stands for???
What is the difference between a wood shake and wood shingles?
why are use steel with conc. instead use of other type materials.
4 Answers College School Exams Tests, Prathima Group,
Please tell me about surveying standard chain details.Thanks.
how to design paver block
why the openings of sieves are square io size?
Why we check specific gravity of admixture when we receive it? What is it's significance.
what are the natural dynamic pressures on a structure in coastal region like chennai, vizag etc,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)