There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
No Answer is Posted For this Question
Be the First to Post Answer
In a given rcc design, how to calculate quantity of steel, for all practical purpose of construction?
What is the unit weight of steel?
what is Quality Reporting?
Should column area deducted from form work measurement of slab in building?
Direct chairs over shutter / beside earth is prohibited because of ––
how to calculate steel quantity in plinth beam&footing
What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building) area of RCC?
how to find quantity of total concrete, cement bags and sand. for any ratio
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Two types of piling
whats the field test of cement,aggregate and water
how 1.52 factor comes while calculating no of bags of cement...from 1:2:4 design mix?
4 Answers CCCL, L&T, Vishwa Infrastructures,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)