Answer / ajay kumar singh
For 100cum of finished concrete =152cum dry volume of
conc. Hence for 1cum the factor will be 1.52
Calculation of material in 1cum of (1:2:4)conc.
Cement=1.52/1+2+4=0.217cum
Sand=0.217*2=0.434cum
Metal=0.217*4=0.868cum
| Is This Answer Correct ? | 64 Yes | 6 No |
Answer / a.jagadesh
For 100cum of finished concrete =152cum dry volume of
conc. Hence for 1cum the factor will be 1.52
Ratio = 1:2:4 For 1m3
= total ingredients = 7
= For cement 1/7x1.52 = 0.217 m3
= For sand 2/7x1.52 = 0.434 m3
= For 20 mm 4/7x1.52 = 0.868 m3
----------
= 1.519 m3 = 1.52 m3
----------
| Is This Answer Correct ? | 20 Yes | 6 No |
Answer / er.balasundari
This 52 means dry volume to be considered always 50-55%. We can choose those 52 r 53 r 54. Bt mstly choose 52%.Hence it is 1m3 + 52%= 1+0.52 = 1.52. This s very crct answer.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / sravan
both the above explanations are correct which give the same result!!!
| Is This Answer Correct ? | 1 Yes | 0 No |
What is a hatch patterns?
Define What is rigging?
I what know about life time of frp tank plz explain about it specifications & other details
what is the tensile strength of 10swg and 8swg gabion wire?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
In barbending schedule why is o.42*D is taken. Means why o.42 only???
clear cover means the distance between main bar outer face to shuttering face. Is it right?
How many required water of 1m3 Brick masonary and slab casting?
1 Answers Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),
what is a steel formula
what is the IS code no. for concrete wastage?
pls tell me , what is the water content
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
11 Answers L&T, Sobha Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)