What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building)
area of RCC?
It totally depend on design and load basis
| Is This Answer Correct ? | 0 Yes | 0 No |
What is meant by autocad?
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
11 Answers L&T, Sobha Developers,
shuttering consumption per square feet in multi storeyed building?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?
reinforcement slab, beam and column formulas?
which "s the best wood for commercial purpose?
How many bricks will be fit in one cubic meter, if the brick measurement is 0.20cm X0.08, If you also write down the formula for this question too.
Why shear forces are usually neglected in column design?
What is the lapping length for 32mm steel rod as per BS standards?
What is the strength of cement?
Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?
28 Answers Aliens Group, Cemplex, DLF, L&T, LBC, Power Trade Engineering, Vishnu, VKM,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)