What are the standard costing variants used for pm orders?
Explain the key steps performed in refurbishment process?
Where do you assign activity type in master data?
What are scheduling parameters?
I have a single cycle maintenance plan that is triggered by a counter assigned to a equipment A. If I replace equipment A with equipment B how do I change my Maintenance plan counter? When I use IP02 "change maintenance Plan" the counter box is greyed out. Thanks for any advice.
how much counter we can assign for multiple counter plan
What is control key?
What is corrective maintenance?
Which price of material is fetched while calculating material price in planned and actual cost in maintenance order?
What is sap pm ?
How to schedule counter base maintenance plant for DG in power plant that need 800hr per month maintthis steps i followed. 1)i have created meas pt with counter (IK01) created meas document IK11 then schedule thru IP10. but not getting due order list in ip24. can any one help me by telling exact cycle. thanks in adv.
Is it possible to change the structure indicator of functional location?
What is meant by single cycle plan ?how it works?