Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case:
Ground Floor: electric room, pump room, 5 shops, each is 15 KW
First Floor: 5 shops, each is 15 KW
Second Floor: showroom 30 KW
Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
No Answer is Posted For this Question
Be the First to Post Answer
why transformer does not obey ohm law?
i have done my b.tech in 2009 .still hunting for a job...wat shud i answer if intervevwr asks..(what u have done 1yr)
How to calculate the Meter constant for the given Meter (by using any formula)
why designer use kva rating instead of kw in transformer rating???????????????
How to calculate KW saving for power factor correction from 0.92 to 0.98 at 350KW load?
What is the cause for a blown fuse in one phase of primery side(HV) of a three phase transformer( 4169v-460v) in the time of closing its supply breaker. There is no load on the secondery side of the transformer in this moment.
can any one know is sbi interview based on merit or based on roll number
how to calculate the speed of a induction motor without using tacho meter?
What is the purpose of RECTIFIER ASSEMBLY in AC power generators?
what is brushless alternator?
why zero sequence impedance measurement is not applicable for single phase GT
why the earth terminal in three pin top is longer than rest of the two terminal and of bigger size?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)