Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case:
Ground Floor: electric room, pump room, 5 shops, each is 15 KW
First Floor: 5 shops, each is 15 KW
Second Floor: showroom 30 KW
Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
No Answer is Posted For this Question
Be the First to Post Answer
The ohm is the unit of:(a) Charge(b) Resistance(c) Power(d) Current
What is polarisation index value?.(pi value) Simple & brief definition of polarisation index?..
Why USe In -48 DC Volt !
v=r*i this means when voltage increases current also increases at constant resistance.... p=v*i this means when voltage increases current decreases to maintain the power constant which one is true...
Dear Brother can u tell the proper size selection of cable & the fault level calculation of braker, busbar etc. pls mail me at azeemk30@gmail.com
what is meant by brushed alternator & its working principle ?
WHY TRANSFORMERS ARE RATED IN 11KV 22KV 33KV Instead off 10kv 20kv 30kv
why we dont store the ac power in battery?
What is the Basic Difference bitween Long Shunt Connection and Short Shunt Connection in DC Generator?
State any two nuclear power stations in India, with their generating capacity.
what are factors to be consider to design a HT & LT motor?
if we convert kva into Ampers,which one formula use by us,pls tell me?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)