Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case:

Ground Floor: electric room, pump room, 5 shops, each is 15 KW
First Floor: 5 shops, each is 15 KW
Second Floor: showroom 30 KW
Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

why transformer does not obey ohm law?

27 Answers  


i have done my b.tech in 2009 .still hunting for a job...wat shud i answer if intervevwr asks..(what u have done 1yr)

1 Answers   TATA,


How to calculate the Meter constant for the given Meter (by using any formula)

4 Answers   HCL, Viva,


why designer use kva rating instead of kw in transformer rating???????????????

9 Answers  


How to calculate KW saving for power factor correction from 0.92 to 0.98 at 350KW load?

5 Answers   Heidelberge Cement,


What is the cause for a blown fuse in one phase of primery side(HV) of a three phase transformer( 4169v-460v) in the time of closing its supply breaker. There is no load on the secondery side of the transformer in this moment.

3 Answers   Novachem,


can any one know is sbi interview based on merit or based on roll number

0 Answers  


how to calculate the speed of a induction motor without using tacho meter?

6 Answers  


What is the purpose of RECTIFIER ASSEMBLY in AC power generators?

2 Answers  


what is brushless alternator?

0 Answers  


why zero sequence impedance measurement is not applicable for single phase GT

0 Answers  


why the earth terminal in three pin top is longer than rest of the two terminal and of bigger size?

6 Answers   BARC, MAHINDRA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)