Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1978Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1966Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1366Post New HMK Interview Questions
Why do we convert categorical variables into factor? Which function is used in r to perform the same?
Explain how you can configure a running aggregate in SSRS?
What are the general requirements of rpa for front and back office processing?
Explain the lifecycle of blue prism?
Where does Spark Driver run on Yarn?
What is gang scheduling in operating system (os)?
Explain perl one-liner?
What happens to a trigger with multiple affected rows?
What is operational data store (ods)?
what are metrics and what are metrics did u collect in you are project
Explain what is big data?
How does csrf attack work?
What is a fieldset in html ?
Describe a situation in which your work was criticized?
Define the collection types in hibernate?