Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1587Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1476Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1009Post New HMK Interview Questions
What is the full form of NABARD and its role?
What is the difference between the broad match and narrow match?
What is the distance between two galaxies?
Explain the advantages of ruby on rails?
Explain lsmw?
How many types css can be include in html?
Explain ai checkers?
are you comfortable shifting your base?
If given a chance would you like to change your domain? If yes, why?
How can you use spring to resolve collaborators for your bean?
What are the three main parts of a spreadsheet?
What is the extension of qtp local repository?
What does it mean to merge a file?
What are the gpc and the gpt?
When I run the sql server 2000 setup, it just hangs. What do I do?