Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2027Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1997Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1396Post New HMK Interview Questions
Compare jfet’s and mosfet’s.
What are the measures to connect to the db using jdbc?
How to load specific no.of records using bteq, or fastload,or multiload
What are the disadvantages of typescript?
Explain the difference between RAM and ROM? What is “Volatile Memory
What makes a function well defined?
Please explain hat is swelling?
UFT 12.02 which ALM version will support
How entity beans support container managed persistence?
What are the customizing prerequisites for document clearing?
Does google use c#?
How are strings stored in c?
How do I run updates?
What are the different types of connections available?
Which is the largest of the ape?