Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
No Answer is Posted For this Question
Be the First to Post Answer
how we control the temperature during concreting ?
Please design 12.5m long dubbly beam
0 Answers Aarya Construction Design,
what u mean by shoring?
How to check the quality of fine aggregate on site?
What is the density of steel?
What are the RISKS during the project construction?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
Cost control in civil construction as well as Quality control
Why is cover provided in beams, slabs, lintels, columns, etc ? What is the drawback of not providing cover in the same?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
0 Answers Bhugan Infracon, UltraTech,
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
How to build the floor to ceiling bookcase?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)