how to frame the sentence in voucher pad ?
Description : 1.Food Expenses during site visit 2.Stamp
Paper approval expenses 3.Travelling expenses 4. sweet
distribution
No Answer is Posted For this Question
Be the First to Post Answer
What is the mixing of D.P.C?
how to calculate rate analysys of 1:6 plastering 10 sq m
How to calculate the quantity of ingredients of M20 grade concrete?
what is the types of door's wood?
how the calculatio is taken for shuttering in staircase.
1 Answers JMC Projects, Tech Mahindra, TechnoArt,
please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Civil engineering related
What are some structures that may be subjected to fatigue?
whats are the max value of providing of super-elevation in road way in various condition?
How to take steel quantity for beams ?how to calculate stirrups
How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)